LIFTING BEAM AND RUNWAY BEAM TESTING

Why load test your beam?
​
A beam load test can be required for one of the following reasons:
 

  • Following the installation of a new beam

​​

  • Following substantial alterations or repairs to the beam or its supporting structure

 

  • If a beam has been out of service for an extended period of time 

 

  • Where testing is recommended by the competent person following a thorough examination

​
​

A load test of a runway beam. A load is applied using a beam clamp, load cell and lever winch with a floor plate anchor. Deflection is measured using a digital dial gauge.
Anchor 1
A lift shaft beam that has been tested and marked with its SWL. The beam has a sticker applied with the test details.

At Elephant, we carry out on-site proof load testing of lifting beams and runway beams. Testing involves applying specified loads and measuring the beam’s response, including deflection, against the agreed acceptance criteria.

​

The test loads, loading positions and measurement requirements are established before testing, taking account of the beam’s intended safe working load and the applicable test specification.

 

Testing and certification

​

Following satisfactory testing and examination, the beam is marked with its safe working load (SWL) and a unique identification number. A digital certificate of test and thorough examination is provided.

​

Relevant standards and legislation

​

  • BS 2853:2011 — Specification for the testing of steel overhead runway beams for hoist blocks.

  • Lifting Operations and Lifting Equipment Regulations 1998 (LOLER).

LIFTING EYE TESTING

At Elephant, we carry out on-site proof load testing of lifting eyes attached to steelwork or installed into concrete, including cast-in sockets and post-installed anchorages.

​

Testing may be required following installation, alterations or repairs, or where specified by the project engineer or competent person.

​

Testing involves applying a specified load in the agreed direction and recording the performance of the installed lifting point. The test requirements take account of the lifting eye, its connection and the supporting structure.

A test report is provided detailing the loads applied, results and observations.

​

Get in touch with photographs, lifting eye details and any available test requirements for a quotation.